[Plant-wide network for an automotive components manufacturer]
Challenge. [What was wrong or needed: e.g. a new plant, unreliable links on the shop floor, a deadline]
What we did. [Scope: survey, design, cabling, fibre backbone, switching, Wi-Fi, testing]
Outcome. [Result in the client's terms: uptime, go-live date met, faults reduced]
